1. 20161228 090512
    1.13.17

    Ulbrich Boys & Girls Club

    The team at Mateflex worked to install a new floor for the Ulbrich Boys and Girls Club right after Christmas.

  2. IMG 0813
    1.3.17

    Minnetonka Christian Academy Volleyball

    This installation took place during the week between Christmas and New Year’s. The school along with Club Tonka Volleyball Club replaced their old floor with the ProGym tile system.

0 of 2